Introduction
Some
townhouses in Northwood IV and V have individually controlled central
air conditioning. Residents may install air conditioners of 12 amps or
less, a minimum of 5,000 BTUs and a maximum of 12,000 BTUs, using platforms
provided by Northwood Community Apartments. Air conditioners must be registered
and a fee is charged. The number of air conditioners is determined by
the number of bedrooms in the townhouse or apartment (i.e., 2 air conditioners
are allowed in a 2 bedroom apartment or townhouse). A separate application
form is required for each air conditioner. Residents who install their
own window air conditioner accept full responsibility for installation
and removal and for any damage incurred during such installation or removal.
Installation
University provided platforms must be used for air conditioner
installation.
Facilities maintenance
staff is available to install resident-owned window air conditioners.
The fee is $35, and includes installation, a platform, installation materials,
and removal. Installation requests are made at the time of registration
at the Community Center and are coordinated by desk staff. Installation
will occur within five business days.
Residents who install their own window air conditioners accept full responsibility
for installation and removal and for any damage incurred during such installation
and removal. Only removable parts of the window may be removed, such as
screens, and sliding window, but not the frame. Residents are responsible
for the replacement of all window hardware upon removal of the air conditioner
unit.
All window air conditioners must be supported by platforms provided by
Housing. Residents who install their own air conditioners can pick up
a platform from the Community Center. Proof of air conditioner registration
is required to pick up a platform. Northwood IV & V residents should
store their platforms in their basements, and may leave them there when
vacating. Northwood I, II & III residents can store their platforms
in their storage units, or return them to the Community Center during
normal business hours. Residents who request installation by Facilities
do not need to pick up a platform.
When extension cords are used, they must be three-wire grounded, in good
condition, and have at least a 14 gauge rating.
All air conditioner units must be plugged into a GFI (three-prong) outlet.
If the outlet is for two-prongs, only, contact the Community Center front
desk and make a request for a GFI outlet. There is no fee for GFI installation.
When filling open spaces between the air conditioner and the window edge,
a hard WATERPROOF MATERIAL such as Plexiglas, plastic, or plywood (minimum
1/16” thick) must be used. All edges should be sealed with a removable
WATERPROOF MATERIAL. 
Costs
for 2007-2008
Air
conditioner use rates are based on BTU ratings and are calculated in one
month increments. The number of months of use is determined at the time
of registration. If a resident removes an air conditioner prior to the
original removal date, a refund will be issued if the unit is removed
on or before the 15th of the month, and for any subsequent unused month
thereafter. (For example, if an air conditioner is registered through
September and is removed on August 14, a refund will be given for one
half of the August rate, and all of September.) Residents will be charged
the full month rate if the unit is removed after the 15th of the month.
A one month minimum installation fee is required, regardless of removal
date. A $35.00 per month late fee is charged to any resident who does
not remove their air conditioner when their registration expires. Use
rates are not affected by factors such as weather, occupancy, or actual
usage following installation.
All air conditioner registration fees will
be assessed to resident/student accounts. This will expedite the refund process, when applicable.
| Air
Conditioner Capacity (BTUs) |
Monthly
Charge per a/c unit |
Facilities
Staff Installation (within 5 business days) |
|
8,000
and below |
$30 |
$35 |
|
10,000
- 12,000 (not to exceed 12,000) |
$40 |
$35 |
Air Conditioners installed between the 1st - 14th of the month will be assessed
at the full monthly rate. Air conditioners installed the 15th through the
end of the month will be assessed at 1/2 of the monthly rate.
Questions
Please
direct questions regarding this process to the staff at Northwood
Community Apartments.
Application
You may complete the
application at the Community Center front desk, at 1000 McIntyre Drive.
The application is also available online: Online Application
|
|